Client: Econvert Water & Energy B.V.
Completion date: September 2026
Location: King's Lynn, England
For Econvert Water & Energy B.V., based in Heerenveen, Oostwouder Tank- & Silobouw constructed three anaerobic reactor tanks and two standpipes for Palm Paper in King's Lynn, England. The production of these installations took place at our De Werf facility in Wieringerwerf.
About the reactors
The anaerobic reactor tanks are part of a wastewater treatment plant. The construction of the tanks and standpipes required specialist welding, precision and craftsmanship.
Transport and installation
After production, the tanks and standpipes were transported by sea-going pontoon from Wieringerwerf to King's Lynn, England. At the site, Oostwouder took care of the subsequent transport, lifting and positioning of the reactors, as well as the installation of stairs and platforms.